Resident question
What changes by path?
Six paths remain in the comparison. They differ in responsibility, property, project/site, timing, terminal position, and failure branch—but none is ranked and none has a calculation-ready cashflow.
The relationship to hold onto
The same decision dimensions must be visible for every path.
Neutrality rule
Comparison is not ranking
Order, color, copy, and detail level do not signal a preferred path. Missing fields stay visibly missing for all six alternatives.
Failure branches
No success-only story
Each path must retain a fallback if agreement, property, MSBA, feasibility, funding, authority, or public approval conditions fail.
Current structure + bounded interim bridge
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
Regional responsibility; Town retains ownership
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
Conditional transfer after defined gates
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
Immediate transfer + same-site renovation/addition
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
New regional school at another site
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
No MSBA / extended bridge
- ResponsibilityRequires controlling evidence
- Property / controlRequires controlling evidence
- Project / siteRequires controlling evidence
- Timing / transitionRequires controlling evidence
- Terminal exposureRequires controlling evidence
NOT READY FOR CALCULATION
Resident comparison workspace
Choose up to three paths.
No path is selected. The model does not choose a default or imply a preference.
This workspace compares completeness and evidence needs. It does not calculate, score, rank, or recommend a path.
See the workbook connection and limits
Workbook binding: WMS Scenario Summary!A1:N45; WMS Cashflow!A1:AA58
Cashflow totals are linked; this page has no independent financial calculation.
Gross cost, local share, Wilbraham share, annual requirement, tax treatment, and terminal position remain separate.
Controlled baseline: v0.7, SHA-256 d35db6de8563ce17bd311f760ac14a607f35839e452d2865477dc067d405b6ff.
Open the full source, missingness, and calculation contract →